416 TrafficKnow before you go
Normal - Drive as usualNormal against the current calendar.

Toronto travel looks manageable

Worst window
No broad peak window
Why
No major trigger listed

Last checked Apr 29, 7:43 a.m. ET. No commute-time or attendance predictions.

Time of day

Qualitative risk by hour, based on event timing and active road restrictions.

6a
7a
8a
9a
10a
11a
12p
1p
2p
3p
4p
5p
6p
7p
8p
9p
10p
11p

Coming into Toronto?

What is stacking today

No major event or road stack is currently listed.

Likely affected routes

Detailed view

Daily congestion brief

No major downtown congestion triggers are currently listed.

Peak window

No broad peak congestion window is currently flagged.

Affected areas

No major affected area listed.

Sources

Source details unavailable.

Drivers entering downtown

Normal downtown driving conditions are expected outside localized event arrivals.

Drivers already downtown

No broad downtown avoidance window is currently flagged.

GO/TTC crowding

No TTC/GO service disruption or major crowding trigger is currently listed.

Score explanation

The public score stays capped at 5, while raw load explains how much is behind that score.

Event load

0

Uncapped event impact

Road load

0

Road impacts counted today

Transit load

0

Included in event load

Display score

0/5

0 raw total before cap

Events

No major events scheduled in downtown Toronto.

In Toronto today

  • Highway 401

    At BAYVIEW AVE

    Full construction

    Continuous Construction on HWY 401 Eastbound On-ramp at BAYVIEW AVE, Toronto. ALL LANES CLOSED.

    Window
    10:00 PM – 5:30 AM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 6May 22

    Closure details →

  • QEW (Toronto Bound)

    Between CONCESSION ROAD and GILMORE ROAD

    Construction

    Continuous Construction on QEW Toronto bound between CONCESSION ROAD and GILMORE ROAD, Fort Erie. 1 Alternating Lane(s).

    Window
    7:00 AM – 5:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 13Aug 28

    Closure details →

  • QEW (Toronto Bound)

    Between PEACE BRIDGE and CONCESSION ROAD

    Construction

    Continuous Construction on QEW Toronto bound between PEACE BRIDGE and CONCESSION ROAD, Fort Erie. 3 Alternating Lane(s).

    Window
    7:00 AM – 6:00 PM
    Lanes
    3 Alternating Lane(s)
    Through
    Apr 21Aug 28

    Closure details →

  • QEW (Toronto Bound)

    Between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD

    Construction

    Nightly Construction on QEW Toronto bound between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • QEW (Toronto Bound)

    Between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET

    Construction

    Nightly Construction on QEW Toronto bound between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET, Burlington. 1 Alternating Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • QEW (Toronto Bound)

    Between BRANT STREET and GUELPH LINE

    Construction

    Nightly Construction on QEW Toronto bound between BRANT STREET and GUELPH LINE, Burlington. 1 Right Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • Highway 401

    At HWY 2/ KINGSTON RD

    Construction

    Daily Maintenance on HWY 401 Eastbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).

    Window
    8:30 AM – 9:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 30May 6

    Closure details →

  • Highway 401

    At MEADOWVALE ROAD

    Construction

    Daily Maintenance on HWY 401 Eastbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).

    Window
    10:30 AM – 11:30 AM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 30May 6

    Closure details →

  • Highway 401

    At MEADOWVALE ROAD

    Full construction

    Daily Maintenance on HWY 401 Westbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.

    Window
    1:00 PM – 1:30 PM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 30May 6

    Closure details →

  • Highway 401

    At MEADOWVALE ROAD

    Construction

    Daily Maintenance on HWY 401 Westbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).

    Window
    12:00 PM – 1:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 30May 5

    Closure details →

  • Highway 401

    At MEADOWVALE ROAD

    Full construction

    Daily Maintenance on HWY 401 Eastbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.

    Window
    11:30 AM – 12:00 PM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 30May 5

    Closure details →

  • Highway 401

    At PORT UNION ROAD

    Full construction

    Daily Maintenance on HWY 401 Eastbound On-ramp at PORT UNION ROAD, Toronto. ALL LANES CLOSED.

    Window
    9:30 AM – 10:30 AM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 30May 6

    Closure details →

  • Highway 401

    At HWY 2/ KINGSTON RD

    Construction

    Daily Maintenance on HWY 401 Westbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).

    Window
    11:30 AM – 12:30 PM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 30May 6

    Closure details →

  • Highway 427

    At DUNDAS STREET

    Full construction

    Nightly Maintenance on HWY 427 Northbound On-ramp at DUNDAS STREET, Toronto. ALL LANES CLOSED.

    Window
    10:00 PM – 5:00 AM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 30May 9

    Closure details →

  • Highway 427

    Between RATHBURN ROAD and HOLIDAY DRIVE

    Construction

    Nightly Maintenance on HWY 427 Southbound Collector between RATHBURN ROAD and HOLIDAY DRIVE, Toronto. 1 Right Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 30May 9

    Closure details →

  • HWY 409 (Westbound)

    Between MARTIN GROVE ROAD and ATTWELL DRIVE

    Construction

    Nightly Maintenance on HWY 409 Westbound between MARTIN GROVE ROAD and ATTWELL DRIVE, Toronto. 2 Left Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    2 Left Lane(s)
    Through
    Apr 30May 9

    Closure details →

  • Highway 427

    At HOLIDAY DRIVE

    Full construction

    Nightly Maintenance on HWY 427 Southbound Off-ramp at HOLIDAY DRIVE, Toronto. ALL LANES CLOSED.

    Window
    11:00 PM – 5:00 AM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 30May 9

    Closure details →

  • Highway 401

    Between JANE ST and JANE ST

    Construction

    Nightly Maintenance on HWY 401 Eastbound Express between JANE ST and JANE ST, Toronto. 1 Left Lane(s).

    Window
    11:59 PM – 6:00 AM
    Lanes
    1 Left Lane(s)
    Through
    May 1May 5

    Closure details →

  • Highway 401

    Between JANE ST and JANE ST

    Construction

    Nightly Maintenance on HWY 401 Westbound Express between JANE ST and JANE ST, Toronto. 1 Left Lane(s).

    Window
    11:00 PM – 6:00 AM
    Lanes
    1 Left Lane(s)
    Through
    May 1May 5

    Closure details →

  • QEW (Toronto Bound)

    Between TRAFALGAR ROAD and TRAFALGAR ROAD

    Construction

    Nightly Maintenance on QEW Toronto bound between TRAFALGAR ROAD and TRAFALGAR ROAD, Oakville. 1 Right Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 8

    Closure details →

  • QEW (Toronto Bound)

    At GILMORE ROAD

    Full construction

    Daily Construction on QEW Toronto bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.

    Window
    6:30 AM – 5:30 PM
    Lanes
    ALL LANES CLOSED
    Through
    May 4May 8

    Closure details →

  • QEW (Toronto Bound)

    At CENTRAL AVENUE

    Full construction

    Daily Construction on QEW Toronto bound On-ramp at CENTRAL AVENUE, Fort Erie. ALL LANES CLOSED.

    Window
    6:00 AM – 6:00 PM
    Lanes
    ALL LANES CLOSED
    Through
    May 4May 8

    Closure details →

  • Highway 401

    Between HWY 400 and HWY 400

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Eastbound Express between HWY 400 and HWY 400, Toronto. 1 Alternating Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 401

    Between HWY 400 and HWY 404

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Eastbound Collector between HWY 400 and HWY 404, Toronto. 1 Alternating Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • HWY 409 (Eastbound)

    Between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD

    Construction

    Nightly Maintenance on HWY 409 Eastbound between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD, Toronto. 2 Left Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    2 Left Lane(s)
    Through
    May 4May 9

    Closure details →

  • Highway 401

    Between MORNINGSIDE AVE and HWY 400

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Westbound Collector between MORNINGSIDE AVE and HWY 400, Toronto. 2 Alternating Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 401

    Between HWY 400 and MORNINGSIDE AVE

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Eastbound Collector between HWY 400 and MORNINGSIDE AVE, Toronto. 2 Alternating Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 401

    Between VICTORIA PARK AVE and HWY 404

    Construction

    Daily Moving Maintenance Closure on HWY 401 Westbound Express between VICTORIA PARK AVE and HWY 404, Toronto. 1 Left Lane(s).

    Window
    9:00 AM – 3:00 PM
    Lanes
    1 Left Lane(s)
    Through
    May 5May 7

    Closure details →

  • Highway 401

    Between HWY 404 and VICTORIA PARK AVE

    Construction

    Daily Moving Maintenance Closure on HWY 401 Eastbound Express between HWY 404 and VICTORIA PARK AVE, Toronto. 1 Left Lane(s).

    Window
    9:00 AM – 3:00 PM
    Lanes
    1 Left Lane(s)
    Through
    May 5May 7

    Closure details →

Show 53 more closures across Ontario
  • Highway 401

    At Highway 4 / Colonel Talbot Rd

    Full construction

    Continuous Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.

    Window
    7:00 AM – 11:59 PM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 7Nov 27

    Closure details →

  • Highway 401

    At Highway 4 / Colonel Talbot Rd

    Full construction

    Continuous Construction on HWY 401 Westbound Off-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.

    Window
    7:00 AM – 11:59 PM
    Lanes
    ALL LANES CLOSED
    Through
    Apr 7Nov 27

    Closure details →

  • QEW (Fort Erie Bound)

    Between RIDGEMOUNT ROAD and CONCESSION ROAD

    Construction

    Continuous Construction on QEW Fort Erie Bound between RIDGEMOUNT ROAD and CONCESSION ROAD, Fort Erie. 1 Alternating Lane(s).

    Window
    7:00 AM – 6:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 13Aug 28

    Closure details →

  • Highway 404

    Between BLOOMINGTON ROAD and VANDORF SIDEROAD

    Construction

    Nightly Construction on HWY 404 Northbound between BLOOMINGTON ROAD and VANDORF SIDEROAD, Aurora. 1 Right Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 17Sep 8

    Closure details →

  • Highway 400

    Between ST VINCENT STREET and SUNNIDALE ROAD

    Construction

    Nightly Engineering Investigation on HWY 400 Southbound between ST VINCENT STREET and SUNNIDALE ROAD, Barrie. 2 Right Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    2 Right Lane(s)
    Through
    Apr 24May 6

    Closure details →

  • Highway 400

    Between 5TH LINE and 9TH CONCESSION

    Construction

    Nightly Construction on HWY 400 Northbound Collector between 5TH LINE and 9TH CONCESSION, Bradford. 2 Alternating Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    Apr 25May 8

    Closure details →

  • Highway 400

    Between 9TH CONCESSION and 5TH LINE

    Construction

    Nightly Construction on HWY 400 Southbound Collector between 9TH CONCESSION and 5TH LINE, Bradford. 2 Alternating Lane(s).

    Window
    10:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    Apr 25May 8

    Closure details →

  • Highway 400

    Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21

    Construction

    Daily Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).

    Window
    Time TBA
    Lanes
    1 Left Lane(s)
    Through
    Apr 27May 14

    Closure details →

  • Highway 400

    Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21

    Construction

    Daily Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).

    Window
    10:00 AM – 11:59 PM
    Lanes
    1 Left Lane(s)
    Through
    Apr 27May 14

    Closure details →

  • Highway 400

    Between SUNNIDALE ROAD and ST VINCENT STREET

    Construction

    Nightly Engineering Investigation on HWY 400 Northbound between SUNNIDALE ROAD and ST VINCENT STREET, Barrie. 2 Right Lane(s).

    Window
    11:00 PM – 5:00 AM
    Lanes
    2 Right Lane(s)
    Through
    Apr 28May 13

    Closure details →

  • QEW (Fort Erie Bound)

    Between GUELPH LINE and BRANT STREET

    Construction

    Nightly Construction on QEW Fort Erie Bound between GUELPH LINE and BRANT STREET, Burlington. 1 Right Lane(s).

    Window
    10:00 PM – 6:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • QEW (Fort Erie Bound)

    Between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD

    Construction

    Nightly Construction on QEW Fort Erie Bound between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD, Burlington. 1 Right Lane(s).

    Window
    10:00 PM – 6:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • QEW (Fort Erie Bound)

    Between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD

    Construction

    Nightly Construction on QEW Fort Erie Bound between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).

    Window
    11:00 PM – 6:00 AM
    Lanes
    1 Right Lane(s)
    Through
    Apr 29May 14

    Closure details →

  • Highway 401

    At LIVERPOOL ROAD

    Construction

    Daily Maintenance on HWY 401 Westbound Collector Off-ramp at LIVERPOOL ROAD, Pickering. 1 Alternating Lane(s).

    Window
    12:30 PM – 1:30 PM
    Lanes
    1 Alternating Lane(s)
    Through
    Apr 30May 6

    Closure details →

  • Highway 400

    At 5TH LINE

    Construction

    Nightly Construction on HWY 400 Southbound between 5TH LINE, Bradford and HWY 9, Kettleby. 2 Alternating Lane(s).

    Window
    7:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    Apr 30May 15

    Closure details →

  • Highway 400

    At HWY 9

    Construction

    Nightly Construction on HWY 400 Northbound between HWY 9, Kettleby and 5TH LINE, Bradford. 2 Alternating Lane(s).

    Window
    8:00 PM – 10:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    Apr 30May 15

    Closure details →

  • Highway 401

    At BROCK ROAD

    Construction

    Daily Maintenance on HWY 401 Eastbound Collector Off-ramp at BROCK ROAD, Pickering. 1 Alternating Lane(s).

    Window
    8:00 AM – 8:30 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 1May 7

    Closure details →

  • Highway 401

    At WESTNEY ROAD

    Construction

    Daily Moving Maintenance Closure on HWY 401 Eastbound Off-ramp at WESTNEY ROAD, Ajax. 1 Alternating Lane(s).

    Window
    10:00 AM – 10:30 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 1May 7

    Closure details →

  • Highway 401

    At SALEM ROAD

    Construction

    Daily Maintenance on HWY 401 Eastbound Off-ramp at SALEM ROAD, Ajax. 1 Alternating Lane(s).

    Window
    12:30 PM – 1:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    May 1May 7

    Closure details →

  • Highway 401

    At BROCK ROAD

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Eastbound Collector between BROCK ROAD, Pickering and HARMONY ROAD, Oshawa. 2 Alternating Lane(s).

    Window
    10:00 PM – 6:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 1May 6

    Closure details →

  • Highway 401

    At HARMONY ROAD

    Construction

    Nightly Moving Maintenance Closure on HWY 401 Westbound between HARMONY ROAD, Oshawa and BROCK ROAD, Pickering. 2 Alternating Lane(s).

    Window
    10:00 PM – 6:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 1May 7

    Closure details →

  • Highway 400

    Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21

    Construction

    Nightly Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).

    Window
    7:00 PM – 5:00 AM
    Lanes
    2 Left Lane(s)
    Through
    May 2May 14

    Closure details →

  • Highway 400

    Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21

    Construction

    Nightly Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).

    Window
    9:00 PM – 7:00 AM
    Lanes
    2 Left Lane(s)
    Through
    May 2May 14

    Closure details →

  • Highway 400

    Between MAJOR MACKENZIE DRIVE and TESTON ROAD

    Construction

    Nightly Construction on HWY 400 Northbound between MAJOR MACKENZIE DRIVE and TESTON ROAD, Vaughan. 2 Left(with HOV) Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    2 Left(with HOV) Lane(s)
    Through
    May 3May 8

    Closure details →

  • Highway 400

    At HWY 11 JCT

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).

    Window
    8:00 PM – 6:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    At SEVERN RIVER BRIDGE

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Southbound between SEVERN RIVER BRIDGE, Tay and HWY 11 JCT, Springwater. 1 Right Lane(s).

    Window
    7:00 PM – 7:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    At MAPLEVIEW DRIVE

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Right Lane(s).

    Window
    8:00 PM – 5:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    At MAPLEVIEW DRIVE

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Right Lane(s).

    Window
    8:00 PM – 6:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    At CANAL RD

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).

    Window
    10:00 PM – 7:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    At HWY 11 JCT

    Construction

    Nightly Moving Maintenance Closure on HWY 400 Northbound between HWY 11 JCT, Springwater and SEVERN RIVER BRIDGE, Tay. 1 Right Lane(s).

    Window
    7:00 PM – 7:00 AM
    Lanes
    1 Right Lane(s)
    Through
    May 3May 9

    Closure details →

  • Highway 400

    Between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE

    Construction

    Nightly Construction on HWY 400 Southbound Express between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE, Vaughan. 3 Alternating Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    3 Alternating Lane(s)
    Through
    May 3May 8

    Closure details →

  • Highway 400

    Between BASS PRO MILLS DRIVE and HIGHWAY 7

    Construction

    Nightly Construction on HWY 400 Southbound Express between BASS PRO MILLS DRIVE and HIGHWAY 7, Vaughan. 3 Alternating Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    3 Alternating Lane(s)
    Through
    May 3May 8

    Closure details →

  • Highway 400

    Between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE

    Construction

    Nightly Construction on HWY 400 Northbound Express between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE, Vaughan. 2 Alternating Lane(s).

    Window
    10:00 PM – 6:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 3May 8

    Closure details →

  • Highway 400

    Between HWY 12 N JCT and HWY 12 N JCT

    Construction

    Nightly Construction on HWY 400 Northbound between HWY 12 N JCT and HWY 12 N JCT, Tay. 1 Alternating Lane(s).

    Window
    9:00 PM – 6:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 3May 8

    Closure details →

  • Highway 401

    Between MAVIS ROAD and HWY 410

    Construction

    Nightly Construction on HWY 401 Eastbound Express between MAVIS ROAD and HWY 410, Mississauga. 1 Alternating Lane(s).

    Window
    8:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 11

    Closure details →

  • HWY 410 (Northbound)

    Between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD

    Construction

    Nightly Construction on HWY 410 Northbound between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD, Brampton. 1 Alternating Lane(s).

    Window
    10:00 PM – 7:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 9

    Closure details →

  • HWY 410 (Southbound)

    Between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7

    Construction

    Nightly Construction on HWY 410 Southbound between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7, Brampton. 1 Alternating Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 9

    Closure details →

  • QEW (Fort Erie Bound)

    At THOMPSON RD

    Full construction

    Daily Construction on QEW Fort Erie Bound On-ramp at THOMPSON RD, Fort Erie. ALL LANES CLOSED.

    Window
    6:00 AM – 6:00 PM
    Lanes
    ALL LANES CLOSED
    Through
    May 4May 8

    Closure details →

  • QEW (Fort Erie Bound)

    At GILMORE ROAD

    Full construction

    Daily Construction on QEW Fort Erie Bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.

    Window
    6:30 AM – 5:30 PM
    Lanes
    ALL LANES CLOSED
    Through
    May 4May 8

    Closure details →

  • QEW (Fort Erie Bound)

    At CONCESSION ROAD

    Full construction

    Daily Construction on QEW Fort Erie Bound On-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.

    Window
    6:00 AM – 6:00 PM
    Lanes
    ALL LANES CLOSED
    Through
    May 4May 8

    Closure details →

  • Highway 400

    At CANAL RD

    Construction

    Nightly Maintenance on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).

    Window
    8:00 PM – 7:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 400

    At MAPLEVIEW DRIVE

    Construction

    Nightly Maintenance on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Alternating Lane(s).

    Window
    8:00 PM – 6:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 400

    At HWY 11 JCT

    Construction

    Nightly Maintenance on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).

    Window
    8:00 PM – 6:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 400

    At MAPLEVIEW DRIVE

    Construction

    Nightly Maintenance on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Alternating Lane(s).

    Window
    8:00 PM – 5:00 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 401

    At LAKE RIDGE ROAD

    Construction

    Daily Maintenance on HWY 401 Eastbound Off-ramp at LAKE RIDGE ROAD, Whitby. 1 Alternating Lane(s).

    Window
    8:00 AM – 8:30 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 7

    Closure details →

  • Highway 404

    At HWY 7

    Construction

    Daily Maintenance on HWY 404 Southbound Off-ramp at HWY 7, Markham-Richmondhill . 1 Left(with HOV) Lane(s).

    Window
    8:00 AM – 2:00 PM
    Lanes
    1 Left(with HOV) Lane(s)
    Through
    May 4May 11

    Closure details →

  • Highway 404

    At MAJOR MACKENZIE DRIVE

    Construction

    Daily Maintenance on HWY 404 Southbound Off-ramp at MAJOR MACKENZIE DRIVE, Markham-Richmondhill . 1 Left(with HOV) Lane(s).

    Window
    8:00 AM – 2:00 PM
    Lanes
    1 Left(with HOV) Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 400

    Between QUARRY RD/SIMCOE 59 and HWY 12 N JCT

    Construction

    Daily Construction on HWY 400 Southbound between QUARRY RD/SIMCOE 59 and HWY 12 N JCT, Tay. 1 Alternating Lane(s).

    Window
    9:00 AM – 3:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • Highway 400

    Between HWY 12 N JCT and HWY 12 N JCT

    Construction

    Daily Construction on HWY 400 Northbound between HWY 12 N JCT and HWY 12 N JCT, Tay. 1 Alternating Lane(s).

    Window
    9:00 AM – 2:00 PM
    Lanes
    1 Alternating Lane(s)
    Through
    May 4May 8

    Closure details →

  • QEW (Fort Erie Bound)

    Between CONCESSION ROAD and CENTRAL AVENUE

    Construction

    Continuous Construction on QEW Fort Erie Bound between CONCESSION ROAD and CENTRAL AVENUE, Fort Erie. 2 Alternating Lane(s).

    Window
    7:00 AM – 6:00 PM
    Lanes
    2 Alternating Lane(s)
    Through
    May 4Aug 28

    Closure details →

  • Highway 400

    At HWY 12 N JCT

    Construction

    Daily Maintenance on HWY 400 Southbound between HWY 12 N JCT, Tay and MOONSTONE ROAD/SIMCOE ROAD 19, Oro Medonte. 1 Right Lane(s).

    Window
    7:00 AM – 3:00 PM
    Lanes
    1 Right Lane(s)
    Through
    May 4May 7

    Closure details →

  • HWY 403 MISSISSAUGA (Eastbound)

    Between WINSTON CHURCHILL BLVD and ERIN MILLS PKWY

    Construction

    Nightly Construction on HWY 403 MISSISSAUGA Eastbound between WINSTON CHURCHILL BLVD and ERIN MILLS PKWY, Mississauga. 2 Alternating Lane(s).

    Window
    9:00 PM – 5:00 AM
    Lanes
    2 Alternating Lane(s)
    Through
    May 4May 9

    Closure details →

  • QEW (Fort Erie Bound)

    Between MOUNTAIN ROAD and THOROLD STONE ROAD

    Construction

    Nightly Construction on QEW Fort Erie Bound between MOUNTAIN ROAD and THOROLD STONE ROAD, Niagara Falls. 1 Alternating Lane(s).

    Window
    8:30 PM – 6:30 AM
    Lanes
    1 Alternating Lane(s)
    Through
    May 5May 6

    Closure details →