Toronto travel looks manageable
- Worst window
- No broad peak window
- Why
- No major trigger listed
Last checked Apr 29, 7:43 a.m. ET. No commute-time or attendance predictions.
Time of day
Qualitative risk by hour, based on event timing and active road restrictions.
Coming into Toronto?
- HWY 401 (Eastbound): full closureBROCK ROAD
- HWY 401 (Eastbound): full closureWHITES ROAD
- HWY 401 (Westbound): full closureLIVERPOOL ROAD
What is stacking today
No major event or road stack is currently listed.
Likely affected routes
Highway 401
closed
BAYVIEW AVE
Detailed view
Daily congestion brief
No major downtown congestion triggers are currently listed.
Peak window
No broad peak congestion window is currently flagged.
Affected areas
No major affected area listed.
Sources
Source details unavailable.
Drivers entering downtown
Normal downtown driving conditions are expected outside localized event arrivals.
Drivers already downtown
No broad downtown avoidance window is currently flagged.
GO/TTC crowding
No TTC/GO service disruption or major crowding trigger is currently listed.
Score explanation
The public score stays capped at 5, while raw load explains how much is behind that score.
Event load
0
Uncapped event impact
Road load
0
Road impacts counted today
Transit load
0
Included in event load
Display score
0/5
0 raw total before cap
Events
No major events scheduled in downtown Toronto.
In Toronto today
Highway 401
At BAYVIEW AVE
Full constructionContinuous Construction on HWY 401 Eastbound On-ramp at BAYVIEW AVE, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 6 – May 22
QEW (Toronto Bound)
Between CONCESSION ROAD and GILMORE ROAD
ConstructionContinuous Construction on QEW Toronto bound between CONCESSION ROAD and GILMORE ROAD, Fort Erie. 1 Alternating Lane(s).
- Window
- 7:00 AM – 5:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 13 – Aug 28
QEW (Toronto Bound)
Between PEACE BRIDGE and CONCESSION ROAD
ConstructionContinuous Construction on QEW Toronto bound between PEACE BRIDGE and CONCESSION ROAD, Fort Erie. 3 Alternating Lane(s).
- Window
- 7:00 AM – 6:00 PM
- Lanes
- 3 Alternating Lane(s)
- Through
- Apr 21 – Aug 28
QEW (Toronto Bound)
Between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD
ConstructionNightly Construction on QEW Toronto bound between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Toronto Bound)
Between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET
ConstructionNightly Construction on QEW Toronto bound between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET, Burlington. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 29 – May 14
QEW (Toronto Bound)
Between BRANT STREET and GUELPH LINE
ConstructionNightly Construction on QEW Toronto bound between BRANT STREET and GUELPH LINE, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
Highway 401
At MORNINGSIDE AVE
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at MORNINGSIDE AVE, Toronto. ALL LANES CLOSED.
- Window
- 9:00 AM – 9:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 4
Highway 401
At MORNINGSIDE AVE
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at MORNINGSIDE AVE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 AM – 10:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 4
Highway 401
At HWY 2/ KINGSTON RD
ConstructionDaily Maintenance on HWY 401 Eastbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).
- Window
- 8:30 AM – 9:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).
- Window
- 10:30 AM – 11:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
Full constructionDaily Maintenance on HWY 401 Westbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.
- Window
- 1:00 PM – 1:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).
- Window
- 12:00 PM – 1:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 5
Highway 401
At MEADOWVALE ROAD
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.
- Window
- 11:30 AM – 12:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 5
Highway 401
At PORT UNION ROAD
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at PORT UNION ROAD, Toronto. ALL LANES CLOSED.
- Window
- 9:30 AM – 10:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 6
Highway 401
At HWY 2/ KINGSTON RD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).
- Window
- 11:30 AM – 12:30 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 427
At DUNDAS STREET
Full constructionNightly Maintenance on HWY 427 Northbound On-ramp at DUNDAS STREET, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 9
Highway 427
Between RATHBURN ROAD and HOLIDAY DRIVE
ConstructionNightly Maintenance on HWY 427 Southbound Collector between RATHBURN ROAD and HOLIDAY DRIVE, Toronto. 1 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 30 – May 9
HWY 409 (Westbound)
Between MARTIN GROVE ROAD and ATTWELL DRIVE
ConstructionNightly Maintenance on HWY 409 Westbound between MARTIN GROVE ROAD and ATTWELL DRIVE, Toronto. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 30 – May 9
Highway 427
At HOLIDAY DRIVE
Full constructionNightly Maintenance on HWY 427 Southbound Off-ramp at HOLIDAY DRIVE, Toronto. ALL LANES CLOSED.
- Window
- 11:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 9
Highway 401
Between JANE ST and JANE ST
ConstructionNightly Maintenance on HWY 401 Eastbound Express between JANE ST and JANE ST, Toronto. 1 Left Lane(s).
- Window
- 11:59 PM – 6:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- May 1 – May 5
Highway 401
Between JANE ST and JANE ST
ConstructionNightly Maintenance on HWY 401 Westbound Express between JANE ST and JANE ST, Toronto. 1 Left Lane(s).
- Window
- 11:00 PM – 6:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- May 1 – May 5
QEW (Toronto Bound)
Between TRAFALGAR ROAD and TRAFALGAR ROAD
ConstructionNightly Maintenance on QEW Toronto bound between TRAFALGAR ROAD and TRAFALGAR ROAD, Oakville. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 8
QEW (Toronto Bound)
At GILMORE ROAD
Full constructionDaily Construction on QEW Toronto bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:30 AM – 5:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- May 4 – May 8
QEW (Toronto Bound)
At CENTRAL AVENUE
Full constructionDaily Construction on QEW Toronto bound On-ramp at CENTRAL AVENUE, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- May 4 – May 8
Highway 401
Between HWY 400 and HWY 400
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Express between HWY 400 and HWY 400, Toronto. 1 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 401
Between HWY 400 and HWY 404
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Collector between HWY 400 and HWY 404, Toronto. 1 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
HWY 409 (Eastbound)
Between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD
ConstructionNightly Maintenance on HWY 409 Eastbound between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD, Toronto. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- May 4 – May 9
Highway 401
Between MORNINGSIDE AVE and HWY 400
ConstructionNightly Moving Maintenance Closure on HWY 401 Westbound Collector between MORNINGSIDE AVE and HWY 400, Toronto. 2 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 401
Between HWY 400 and MORNINGSIDE AVE
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Collector between HWY 400 and MORNINGSIDE AVE, Toronto. 2 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 4 – May 8
Show 59 more closures across Ontario
Highway 401
At Highway 4 / Colonel Talbot Rd
Full constructionContinuous Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
- Window
- 7:00 AM – 11:59 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 7 – Nov 27
Highway 401
At Highway 4 / Colonel Talbot Rd
Full constructionContinuous Construction on HWY 401 Westbound Off-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
- Window
- 7:00 AM – 11:59 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 7 – Nov 27
QEW (Fort Erie Bound)
Between RIDGEMOUNT ROAD and CONCESSION ROAD
ConstructionContinuous Construction on QEW Fort Erie Bound between RIDGEMOUNT ROAD and CONCESSION ROAD, Fort Erie. 1 Alternating Lane(s).
- Window
- 7:00 AM – 6:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 13 – Aug 28
Highway 404
Between BLOOMINGTON ROAD and VANDORF SIDEROAD
ConstructionNightly Construction on HWY 404 Northbound between BLOOMINGTON ROAD and VANDORF SIDEROAD, Aurora. 1 Right Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 17 – Sep 8
Highway 404
At AURORA ROAD
ConstructionDaily Maintenance on HWY 404 Southbound between AURORA ROAD, Whitchurch-Stouffville and STOUFFVILLE ROAD, Stouffville-Richmondhill. 1 Alternating Lane(s).
- Window
- 8:00 AM – 3:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 21 – May 4
Highway 404
At STOUFFVILLE ROAD
ConstructionDaily Maintenance on HWY 404 Northbound between STOUFFVILLE ROAD, Stouffville-Richmondhill and AURORA ROAD, Whitchurch-Stouffville. 1 Alternating Lane(s).
- Window
- 8:00 AM – 3:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 21 – May 4
Highway 400
Between ST VINCENT STREET and SUNNIDALE ROAD
ConstructionNightly Engineering Investigation on HWY 400 Southbound between ST VINCENT STREET and SUNNIDALE ROAD, Barrie. 2 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 24 – May 6
Highway 400
Between 5TH LINE and 9TH CONCESSION
ConstructionNightly Construction on HWY 400 Northbound Collector between 5TH LINE and 9TH CONCESSION, Bradford. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 25 – May 8
Highway 400
Between 9TH CONCESSION and 5TH LINE
ConstructionNightly Construction on HWY 400 Southbound Collector between 9TH CONCESSION and 5TH LINE, Bradford. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 25 – May 8
Highway 401
Between HWY 16 (IC 721B) and HWY 16 (IC 721B)
ConstructionNightly Maintenance on HWY 401 Westbound between HWY 16 (IC 721B) and HWY 16 (IC 721B), Johnstown. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 4
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionDaily Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).
- Window
- Time TBA
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 14
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionDaily Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).
- Window
- 10:00 AM – 11:59 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 14
Highway 401
At BOUNDARY RD (IC 796)
ConstructionDaily Engineering Investigation on HWY 401 Eastbound between BOUNDARY RD (IC 796), Cornwall and SUMMERSTOWN RD (IC 804)/SD&G CR 27, Summerstown. 1 Left Lane(s).
- Window
- 8:00 AM – 6:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – May 4
Highway 401
At SUMMERSTOWN RD (IC 804)/SD&G CR 27
ConstructionDaily Engineering Investigation on HWY 401 Westbound between SUMMERSTOWN RD (IC 804)/SD&G CR 27, Summerstown and BOUNDARY RD (IC 796), Cornwall. 1 Left Lane(s).
- Window
- 8:00 AM – 6:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – May 4
Highway 400
Between SUNNIDALE ROAD and ST VINCENT STREET
ConstructionNightly Engineering Investigation on HWY 400 Northbound between SUNNIDALE ROAD and ST VINCENT STREET, Barrie. 2 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 28 – May 13
QEW (Fort Erie Bound)
Between GUELPH LINE and BRANT STREET
ConstructionNightly Construction on QEW Fort Erie Bound between GUELPH LINE and BRANT STREET, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Fort Erie Bound)
Between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD
ConstructionNightly Construction on QEW Fort Erie Bound between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Fort Erie Bound)
Between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD
ConstructionNightly Construction on QEW Fort Erie Bound between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).
- Window
- 11:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
Highway 401
At LIVERPOOL ROAD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at LIVERPOOL ROAD, Pickering. 1 Alternating Lane(s).
- Window
- 12:30 PM – 1:30 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 400
At 5TH LINE
ConstructionNightly Construction on HWY 400 Southbound between 5TH LINE, Bradford and HWY 9, Kettleby. 2 Alternating Lane(s).
- Window
- 7:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 30 – May 15
Highway 400
At HWY 9
ConstructionNightly Construction on HWY 400 Northbound between HWY 9, Kettleby and 5TH LINE, Bradford. 2 Alternating Lane(s).
- Window
- 8:00 PM – 10:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 30 – May 15
QEW (Fort Erie Bound)
At BURLINGTON SKYWAY
Full constructionNightly Construction on QEW Fort Erie Bound On-ramp at BURLINGTON SKYWAY, Burlington. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- May 1 – May 4
QEW (Fort Erie Bound)
Between BURLINGTON SKYWAY and BURLINGTON SKYWAY
ConstructionContinuous Construction on QEW Fort Erie Bound between BURLINGTON SKYWAY and BURLINGTON SKYWAY, Burlington. 2 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- May 1 – May 4
Highway 401
At BROCK ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound Collector Off-ramp at BROCK ROAD, Pickering. 1 Alternating Lane(s).
- Window
- 8:00 AM – 8:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 1 – May 7
Highway 401
At WESTNEY ROAD
ConstructionDaily Moving Maintenance Closure on HWY 401 Eastbound Off-ramp at WESTNEY ROAD, Ajax. 1 Alternating Lane(s).
- Window
- 10:00 AM – 10:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 1 – May 7
Highway 401
At SALEM ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound Off-ramp at SALEM ROAD, Ajax. 1 Alternating Lane(s).
- Window
- 12:30 PM – 1:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 1 – May 7
Highway 401
At BROCK ROAD
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Collector between BROCK ROAD, Pickering and HARMONY ROAD, Oshawa. 2 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 1 – May 6
Highway 401
At HARMONY ROAD
ConstructionNightly Moving Maintenance Closure on HWY 401 Westbound between HARMONY ROAD, Oshawa and BROCK ROAD, Pickering. 2 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 1 – May 7
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionNightly Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).
- Window
- 7:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- May 2 – May 14
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionNightly Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).
- Window
- 9:00 PM – 7:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- May 2 – May 14
Highway 400
Between MAJOR MACKENZIE DRIVE and TESTON ROAD
ConstructionNightly Construction on HWY 400 Northbound between MAJOR MACKENZIE DRIVE and TESTON ROAD, Vaughan. 2 Left(with HOV) Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 2 Left(with HOV) Lane(s)
- Through
- May 3 – May 8
Highway 400
At HWY 11 JCT
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
At SEVERN RIVER BRIDGE
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between SEVERN RIVER BRIDGE, Tay and HWY 11 JCT, Springwater. 1 Right Lane(s).
- Window
- 7:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Right Lane(s).
- Window
- 8:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
At CANAL RD
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).
- Window
- 10:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
At HWY 11 JCT
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between HWY 11 JCT, Springwater and SEVERN RIVER BRIDGE, Tay. 1 Right Lane(s).
- Window
- 7:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- May 3 – May 9
Highway 400
Between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE
ConstructionNightly Construction on HWY 400 Southbound Express between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE, Vaughan. 3 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 3 Alternating Lane(s)
- Through
- May 3 – May 8
Highway 400
Between BASS PRO MILLS DRIVE and HIGHWAY 7
ConstructionNightly Construction on HWY 400 Southbound Express between BASS PRO MILLS DRIVE and HIGHWAY 7, Vaughan. 3 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 3 Alternating Lane(s)
- Through
- May 3 – May 8
Highway 400
Between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE
ConstructionNightly Construction on HWY 400 Northbound Express between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE, Vaughan. 2 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 3 – May 8
Highway 400
Between HWY 12 N JCT and HWY 12 N JCT
ConstructionNightly Construction on HWY 400 Northbound between HWY 12 N JCT and HWY 12 N JCT, Tay. 1 Alternating Lane(s).
- Window
- 9:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 3 – May 8
Highway 401
Between MAVIS ROAD and HWY 410
ConstructionNightly Construction on HWY 401 Eastbound Express between MAVIS ROAD and HWY 410, Mississauga. 1 Alternating Lane(s).
- Window
- 8:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 11
HWY 410 (Northbound)
Between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD
ConstructionNightly Construction on HWY 410 Northbound between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD, Brampton. 1 Alternating Lane(s).
- Window
- 10:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 9
HWY 410 (Southbound)
Between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7
ConstructionNightly Construction on HWY 410 Southbound between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7, Brampton. 1 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 9
QEW (Fort Erie Bound)
At THOMPSON RD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- May 4 – May 8
QEW (Fort Erie Bound)
At GILMORE ROAD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:30 AM – 5:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- May 4 – May 8
QEW (Fort Erie Bound)
At CONCESSION ROAD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- May 4 – May 8
Highway 400
At CANAL RD
ConstructionNightly Maintenance on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Maintenance on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Alternating Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 400
At HWY 11 JCT
ConstructionNightly Maintenance on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Maintenance on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Alternating Lane(s).
- Window
- 8:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 401
At LAKE RIDGE ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound Off-ramp at LAKE RIDGE ROAD, Whitby. 1 Alternating Lane(s).
- Window
- 8:00 AM – 8:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 7
Highway 404
At HWY 7
ConstructionDaily Maintenance on HWY 404 Southbound Off-ramp at HWY 7, Markham-Richmondhill . 1 Left(with HOV) Lane(s).
- Window
- 8:00 AM – 2:00 PM
- Lanes
- 1 Left(with HOV) Lane(s)
- Through
- May 4 – May 11
Highway 404
At MAJOR MACKENZIE DRIVE
ConstructionDaily Maintenance on HWY 404 Southbound Off-ramp at MAJOR MACKENZIE DRIVE, Markham-Richmondhill . 1 Left(with HOV) Lane(s).
- Window
- 8:00 AM – 2:00 PM
- Lanes
- 1 Left(with HOV) Lane(s)
- Through
- May 4 – May 8
Highway 400
Between QUARRY RD/SIMCOE 59 and HWY 12 N JCT
ConstructionDaily Construction on HWY 400 Southbound between QUARRY RD/SIMCOE 59 and HWY 12 N JCT, Tay. 1 Alternating Lane(s).
- Window
- 9:00 AM – 3:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
Highway 400
Between HWY 12 N JCT and HWY 12 N JCT
ConstructionDaily Construction on HWY 400 Northbound between HWY 12 N JCT and HWY 12 N JCT, Tay. 1 Alternating Lane(s).
- Window
- 9:00 AM – 2:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- May 4 – May 8
QEW (Fort Erie Bound)
Between CONCESSION ROAD and CENTRAL AVENUE
ConstructionContinuous Construction on QEW Fort Erie Bound between CONCESSION ROAD and CENTRAL AVENUE, Fort Erie. 2 Alternating Lane(s).
- Window
- 7:00 AM – 6:00 PM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 4 – Aug 28
Highway 400
At HWY 12 N JCT
ConstructionDaily Maintenance on HWY 400 Southbound between HWY 12 N JCT, Tay and MOONSTONE ROAD/SIMCOE ROAD 19, Oro Medonte. 1 Right Lane(s).
- Window
- 7:00 AM – 3:00 PM
- Lanes
- 1 Right Lane(s)
- Through
- May 4 – May 7
HWY 403 MISSISSAUGA (Eastbound)
Between WINSTON CHURCHILL BLVD and ERIN MILLS PKWY
ConstructionNightly Construction on HWY 403 MISSISSAUGA Eastbound between WINSTON CHURCHILL BLVD and ERIN MILLS PKWY, Mississauga. 2 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- May 4 – May 9