Toronto travel looks manageable
- Worst window
- No broad peak window
- Why
- No major trigger listed
Last checked Apr 29, 7:43 a.m. ET. No commute-time or attendance predictions.
Time of day
Qualitative risk by hour, based on event timing and active road restrictions.
Coming into Toronto?
- HWY 401 (Eastbound): full closureBROCK ROAD
- HWY 401 (Westbound): full closureHWY 10 / HURONTARIO STREET
- HWY 427 (Northbound): full closureGIBBS ROAD
What is stacking today
No major event or road stack is currently listed.
Likely affected routes
Highway 401
closed
BAYVIEW AVE
QEW (Toronto Bound)
closed
CENTRAL AVENUE
Detailed view
Daily congestion brief
No major downtown congestion triggers are currently listed.
Peak window
No broad peak congestion window is currently flagged.
Affected areas
No major affected area listed.
Sources
Source details unavailable.
Drivers entering downtown
Normal downtown driving conditions are expected outside localized event arrivals.
Drivers already downtown
No broad downtown avoidance window is currently flagged.
GO/TTC crowding
No TTC/GO service disruption or major crowding trigger is currently listed.
Score explanation
The public score stays capped at 5, while raw load explains how much is behind that score.
Event load
0
Uncapped event impact
Road load
0
Road impacts counted today
Transit load
0
Included in event load
Display score
0/5
0 raw total before cap
Events
No major events scheduled in downtown Toronto.
In Toronto today
Highway 401
At BAYVIEW AVE
Full constructionContinuous Construction on HWY 401 Eastbound On-ramp at BAYVIEW AVE, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 6 – May 22
QEW (Toronto Bound)
Between CONCESSION ROAD and GILMORE ROAD
ConstructionContinuous Construction on QEW Toronto bound between CONCESSION ROAD and GILMORE ROAD, Fort Erie. 1 Alternating Lane(s).
- Window
- 7:00 AM – 5:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 13 – Aug 28
QEW (Toronto Bound)
At CENTRAL AVENUE
ConstructionNightly Moving Maintenance Closure on QEW Toronto bound between CENTRAL AVENUE, Fort Erie and MCLEOD ROAD, Niagara Falls. 1 Alternating Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 19 – May 1
QEW (Toronto Bound)
Between PEACE BRIDGE and CONCESSION ROAD
ConstructionContinuous Construction on QEW Toronto bound between PEACE BRIDGE and CONCESSION ROAD, Fort Erie. 3 Alternating Lane(s).
- Window
- 7:00 AM – 6:00 PM
- Lanes
- 3 Alternating Lane(s)
- Through
- Apr 21 – Aug 28
QEW (Toronto Bound)
At MCLEOD ROAD
ConstructionNightly Maintenance on QEW Toronto bound between MCLEOD ROAD, Niagara Falls and ONTARIO STREET -BEAMSVILLE, Lincoln. 1 Alternating Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 23 – May 1
QEW (Toronto Bound)
Between CAWTHRA ROAD and DIXIE ROAD
ConstructionNightly Construction on QEW Toronto bound between CAWTHRA ROAD and DIXIE ROAD, Mississauga. 2 Left Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 26 – May 3
Highway 401
Between Northumberland CR 28 (IC 464) / Ontario St and CR 2 (IC 461) / Toronto Rd
ConstructionNightly Construction on HWY 401 Westbound between Northumberland CR 28 (IC 464) / Ontario St and CR 2 (IC 461) / Toronto Rd, Port Hope. 2 Right Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 27 – May 1
QEW (Toronto Bound)
At CENTRAL AVENUE
Full constructionDaily Construction on QEW Toronto bound On-ramp at CENTRAL AVENUE, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Toronto Bound)
At GILMORE ROAD
Full constructionDaily Construction on QEW Toronto bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:30 AM – 5:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Toronto Bound)
At CONCESSION ROAD
Full constructionDaily Construction on QEW Toronto bound Off-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Toronto Bound)
At THOMPSON RD
Full constructionDaily Construction on QEW Toronto bound Off-ramp at THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Toronto Bound)
At BERTIE ST / THOMPSON RD
Full constructionDaily Construction on QEW Toronto bound On-ramp at BERTIE ST / THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
Highway 401
Between MORNINGSIDE AVE and HWY 400
ConstructionNightly Maintenance on HWY 401 Westbound Express between MORNINGSIDE AVE and HWY 400, Toronto. 2 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
Between HWY 400 and HWY 400
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Express between HWY 400 and HWY 400, Toronto. 1 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
Between HWY 404 and HWY 400
ConstructionNightly Moving Maintenance Closure on HWY 401 Westbound Collector between HWY 404 and HWY 400, Toronto. 1 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
Between HWY 400 and MORNINGSIDE AVE
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Collector between HWY 400 and MORNINGSIDE AVE, Toronto. 2 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
Between HWY 400 and HWY 404
ConstructionNightly Moving Maintenance Closure on HWY 401 Eastbound Express between HWY 400 and HWY 404, Toronto. 1 Alternating Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 1
HWY 409 (Eastbound)
Between HWY 427 and CARLINGVIEW DRIVE
ConstructionNightly Maintenance on HWY 409 Eastbound between HWY 427 and CARLINGVIEW DRIVE, Toronto. 1 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 2
HWY 409 (Westbound)
Between ATTWELL DRIVE and CARLINGVIEW DRIVE
ConstructionNightly Maintenance on HWY 409 Westbound between ATTWELL DRIVE and CARLINGVIEW DRIVE, Toronto. 1 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 2
Highway 401
Between AVENUE ROAD and LESLIE STREET
Full constructionNightly Construction on HWY 401 Eastbound Collector between AVENUE ROAD and LESLIE STREET, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
Highway 401
At RENFORTH DR
Full constructionNightly Maintenance on HWY 401 Eastbound On-ramp at RENFORTH DR, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 28 – Apr 30
Highway 401
At EGLINTON AVE
ConstructionNightly Maintenance on HWY 401 Eastbound Express Off-ramp at EGLINTON AVE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 28 – Apr 30
Highway 401
At EGLINTON AVE
ConstructionNightly Maintenance on HWY 401 Westbound On-ramp at EGLINTON AVE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 28 – Apr 30
Highway 401
At HWY 427
ConstructionNightly Maintenance on HWY 401 Eastbound Collector Off-ramp at HWY 427, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 28 – Apr 30
Highway 401
At CARLINGVIEW DR
Full constructionNightly Maintenance on HWY 401 Westbound Collector Off-ramp at CARLINGVIEW DR, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 28 – Apr 30
Highway 427
Between EGLINTON AVENUE and EGLINTON AVE
ConstructionNightly Maintenance on HWY 427 Northbound Express between EGLINTON AVENUE and EGLINTON AVE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 28 – Apr 30
Highway 427
Between EGLINTON AVE and EGLINTON AVENUE
ConstructionNightly Maintenance on HWY 427 Southbound between EGLINTON AVE and EGLINTON AVENUE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 28 – Apr 30
QEW (Toronto Bound)
At THOMPSON RD
Full constructionContinuous Construction on QEW Toronto bound On-ramp at THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 28 – Apr 30
QEW (Toronto Bound)
Between ERIN MILLS PKWY/SOUTHDOWN ROAD and MISSISSAUGA ROAD
ConstructionNightly Maintenance on QEW Toronto bound between ERIN MILLS PKWY/SOUTHDOWN ROAD and MISSISSAUGA ROAD, Mississauga. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 28 – May 2
Highway 427
Between DISCO ROAD/GOREWAY and DISCO ROAD/GOREWAY
ConstructionNightly Maintenance on HWY 427 Southbound between DISCO ROAD/GOREWAY and DISCO ROAD/GOREWAY, Toronto. 1 Right(with HOV) Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right(with HOV) Lane(s)
- Through
- Apr 28 – May 2
QEW (Toronto Bound)
At GUELPH LINE
Full constructionNightly Maintenance on QEW Toronto bound Off-ramp at GUELPH LINE, Burlington. ALL LANES CLOSED.
- Window
- 11:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 29 – May 1
QEW (Toronto Bound)
Between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD
ConstructionNightly Construction on QEW Toronto bound between NORTHSHORE BLVD and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Toronto Bound)
Between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET
ConstructionNightly Construction on QEW Toronto bound between FAIRVIEW STREET/PLAINS ROAD and BRANT STREET, Burlington. 1 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 29 – May 14
Highway 401
At YORKDALE RD/MALL
Full constructionContinuous Maintenance on HWY 401 Westbound Collector Off-ramp at YORKDALE RD/MALL, Toronto. ALL LANES CLOSED.
- Window
- 11:59 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 29 – Apr 30
QEW (Toronto Bound)
Between BRANT STREET and GUELPH LINE
ConstructionNightly Construction on QEW Toronto bound between BRANT STREET and GUELPH LINE, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
Highway 401
At PORT UNION ROAD
Full constructionNightly Construction on HWY 401 Westbound On-ramp at PORT UNION ROAD, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 29 – May 1
Highway 427
At DUNDAS STREET
Full constructionNightly Maintenance on HWY 427 Northbound On-ramp at DUNDAS STREET, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 29 – Apr 30
Highway 401
Between MEADOWVALE ROAD and NEILSON ROAD
ConstructionNightly Construction on HWY 401 Westbound Collector between MEADOWVALE ROAD and NEILSON ROAD, Toronto. 2 Right Lane(s).
- Window
- 9:00 PM – 5:30 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 29 – May 1
QEW (Toronto Bound)
At CENTRAL AVENUE
Full constructionContinuous Construction on QEW Toronto bound On-ramp at CENTRAL AVENUE, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 1
QEW (Toronto Bound)
At CONCESSION ROAD
Full constructionContinuous Construction on QEW Toronto bound Off-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 1
Highway 401
At MORNINGSIDE AVE
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at MORNINGSIDE AVE, Toronto. ALL LANES CLOSED.
- Window
- 9:00 AM – 9:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 4
Highway 401
At MORNINGSIDE AVE
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at MORNINGSIDE AVE, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 AM – 10:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 4
Highway 401
Between LESLIE STREET and DON MILLS ROAD
ConstructionNightly Construction on HWY 401 Eastbound Express between LESLIE STREET and DON MILLS ROAD, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 1
Highway 401
At HWY 2/ KINGSTON RD
ConstructionDaily Maintenance on HWY 401 Eastbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).
- Window
- 8:30 AM – 9:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).
- Window
- 10:30 AM – 11:30 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
Full constructionDaily Maintenance on HWY 401 Westbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.
- Window
- 1:00 PM – 1:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 6
Highway 401
At MEADOWVALE ROAD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at MEADOWVALE ROAD, Toronto. 1 Alternating Lane(s).
- Window
- 12:00 PM – 1:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 5
Highway 401
At MEADOWVALE ROAD
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at MEADOWVALE ROAD, Toronto. ALL LANES CLOSED.
- Window
- 11:30 AM – 12:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 5
Highway 401
Between DON MILLS ROAD and LESLIE STREET
ConstructionNightly Construction on HWY 401 Westbound Express between DON MILLS ROAD and LESLIE STREET, Toronto. 1 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 1
Highway 401
At PORT UNION ROAD
Full constructionDaily Maintenance on HWY 401 Eastbound On-ramp at PORT UNION ROAD, Toronto. ALL LANES CLOSED.
- Window
- 9:30 AM – 10:30 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 6
Highway 401
At HWY 2/ KINGSTON RD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at HWY 2/ KINGSTON RD, Toronto. 1 Alternating Lane(s).
- Window
- 11:30 AM – 12:30 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
Highway 401
Between YONGE ST and LESLIE STREET
ConstructionNightly Construction on HWY 401 Eastbound Collector between YONGE ST and LESLIE STREET, Toronto. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 30 – May 2
Highway 427
At DUNDAS STREET
Full constructionNightly Maintenance on HWY 427 Northbound On-ramp at DUNDAS STREET, Toronto. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 9
HWY 409 (Eastbound)
Between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD
ConstructionNightly Maintenance on HWY 409 Eastbound between CARLINGVIEW DRIVE and KIPLING AVE/BELFIELD ROAD, Toronto. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 30 – May 2
Highway 427
Between RATHBURN ROAD and HOLIDAY DRIVE
ConstructionNightly Maintenance on HWY 427 Southbound Collector between RATHBURN ROAD and HOLIDAY DRIVE, Toronto. 1 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 30 – May 9
HWY 409 (Westbound)
Between MARTIN GROVE ROAD and ATTWELL DRIVE
ConstructionNightly Maintenance on HWY 409 Westbound between MARTIN GROVE ROAD and ATTWELL DRIVE, Toronto. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 30 – May 9
Highway 427
At HOLIDAY DRIVE
Full constructionNightly Maintenance on HWY 427 Southbound Off-ramp at HOLIDAY DRIVE, Toronto. ALL LANES CLOSED.
- Window
- 11:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 9
Show 73 more closures across Ontario
Highway 401
At Highway 4 / Colonel Talbot Rd
Full constructionContinuous Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
- Window
- 7:00 AM – 11:59 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 7 – Nov 27
Highway 401
At Highway 4 / Colonel Talbot Rd
Full constructionContinuous Construction on HWY 401 Westbound Off-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
- Window
- 7:00 AM – 11:59 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 7 – Nov 27
QEW (Fort Erie Bound)
Between RIDGEMOUNT ROAD and CONCESSION ROAD
ConstructionContinuous Construction on QEW Fort Erie Bound between RIDGEMOUNT ROAD and CONCESSION ROAD, Fort Erie. 1 Alternating Lane(s).
- Window
- 7:00 AM – 6:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 13 – Aug 28
HWY 48 (Southbound)
Between ELGIN MILLS ROAD and LITTLE ROUGE RIVER
ConstructionDaily Maintenance on HWY 48 Southbound between ELGIN MILLS ROAD and LITTLE ROUGE RIVER, Markham. 1 Right Lane(s).
- Window
- 9:00 AM – 2:00 PM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 16 – Apr 30
Highway 404
Between BLOOMINGTON ROAD and VANDORF SIDEROAD
ConstructionNightly Construction on HWY 404 Northbound between BLOOMINGTON ROAD and VANDORF SIDEROAD, Aurora. 1 Right Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 17 – Sep 8
Highway 401
Between HWY 10 / HURONTARIO STREET and HWY 10 / HURONTARIO STREET
ConstructionNightly Construction on HWY 401 Westbound Express between HWY 10 / HURONTARIO STREET and HWY 10 / HURONTARIO STREET, Mississauga. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 19 – May 1
Highway 401
At HWY 10 / HURONTARIO STREET
ConstructionNightly Construction on HWY 401 Westbound Off-ramp at HWY 10 / HURONTARIO STREET, Mississauga. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 19 – May 1
Highway 401
At HWY 10 / HURONTARIO STREET
ConstructionNightly Construction on HWY 401 Eastbound Off-ramp at HWY 10 / HURONTARIO STREET, Mississauga. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 19 – May 1
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionNightly Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Alternating Lane(s).
- Window
- 9:00 PM – 7:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 19 – May 1
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionNightly Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Alternating Lane(s).
- Window
- 7:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 19 – May 1
QEW (Fort Erie Bound)
At MCLEOD ROAD
ConstructionNightly Moving Maintenance Closure on QEW Fort Erie Bound between MCLEOD ROAD, Niagara Falls and CENTRAL AVENUE, Fort Erie. 1 Alternating Lane(s).
- Window
- 8:00 PM – 9:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 19 – May 1
Highway 404
At AURORA ROAD
ConstructionDaily Maintenance on HWY 404 Southbound between AURORA ROAD, Whitchurch-Stouffville and STOUFFVILLE ROAD, Stouffville-Richmondhill. 1 Alternating Lane(s).
- Window
- 8:00 AM – 3:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 21 – May 4
Highway 404
At STOUFFVILLE ROAD
ConstructionDaily Maintenance on HWY 404 Northbound between STOUFFVILLE ROAD, Stouffville-Richmondhill and AURORA ROAD, Whitchurch-Stouffville. 1 Alternating Lane(s).
- Window
- 8:00 AM – 3:00 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 21 – May 4
QEW (Fort Erie Bound)
At ONTARIO STREET -BEAMSVILLE
ConstructionNightly Maintenance on QEW Fort Erie Bound between ONTARIO STREET -BEAMSVILLE, Lincoln and MCLEOD ROAD, Niagara Falls. 1 Alternating Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 23 – May 1
Highway 400
Between ST VINCENT STREET and SUNNIDALE ROAD
ConstructionNightly Engineering Investigation on HWY 400 Southbound between ST VINCENT STREET and SUNNIDALE ROAD, Barrie. 2 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 24 – May 6
Highway 400
Between 5TH LINE and 9TH CONCESSION
ConstructionNightly Construction on HWY 400 Northbound Collector between 5TH LINE and 9TH CONCESSION, Bradford. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 25 – May 8
Highway 400
Between 9TH CONCESSION and 5TH LINE
ConstructionNightly Construction on HWY 400 Southbound Collector between 9TH CONCESSION and 5TH LINE, Bradford. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 25 – May 8
Highway 400
At CANAL RD
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).
- Window
- 10:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
At HWY 11 JCT
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
At MAPLEVIEW DRIVE
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Right Lane(s).
- Window
- 8:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
At SEVERN RIVER BRIDGE
ConstructionNightly Moving Maintenance Closure on HWY 400 Southbound between SEVERN RIVER BRIDGE, Tay and HWY 11 JCT, Springwater. 1 Right Lane(s).
- Window
- 7:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
At HWY 11 JCT
ConstructionNightly Moving Maintenance Closure on HWY 400 Northbound between HWY 11 JCT, Springwater and SEVERN RIVER BRIDGE, Tay. 1 Right Lane(s).
- Window
- 7:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 2
Highway 400
Between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE
ConstructionNightly Construction on HWY 400 Southbound Express between MAJOR MACKENZIE DRIVE and BASS PRO MILLS DRIVE, Vaughan. 1 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 26 – May 1
Highway 400
Between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE
ConstructionNightly Construction on HWY 400 Northbound Express between BASS PRO MILLS DRIVE and MAJOR MACKENZIE DRIVE, Vaughan. 1 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 26 – May 1
Highway 401
Between STEWART BLVD (IC 696)/Leeds & Grenville CR 29 (Brockville) and North AUGUSTA RD (IC 698)
ConstructionNightly Construction on HWY 401 Eastbound between STEWART BLVD (IC 696)/Leeds & Grenville CR 29 (Brockville) and North AUGUSTA RD (IC 698), Brockville. 1 Left Lane(s).
- Window
- 7:00 PM – 11:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 26 – May 1
Highway 401
Between HWY 16 (IC 721B) and HWY 16 (IC 721B)
ConstructionNightly Maintenance on HWY 401 Westbound between HWY 16 (IC 721B) and HWY 16 (IC 721B), Johnstown. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 4
Highway 400
At DUNLOP STREET / SIMCOE ROAD 90
Full constructionNightly Construction on HWY 400 Northbound On-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
- Window
- 9:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 26 – Apr 30
QEW (Fort Erie Bound)
Between DIXIE ROAD and CAWTHRA ROAD
ConstructionNightly Construction on QEW Fort Erie Bound between DIXIE ROAD and CAWTHRA ROAD, Mississauga. 2 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Left Lane(s)
- Through
- Apr 26 – May 3
Highway 401
At Leeds & Grenville CR 2 (IC 687)- Long Beach
ConstructionNightly Maintenance on HWY 401 Westbound between Leeds & Grenville CR 2 (IC 687)- Long Beach, Long Beach and NAPANEE SERVICE CENTER E5 W/B , Odessa. 1 Right Lane(s).
- Window
- 8:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 1
Highway 401
At NAPANEE SERVICE CENTER E5 W/B
ConstructionNightly Maintenance on HWY 401 Eastbound between NAPANEE SERVICE CENTER E5 W/B , Odessa and Leeds & Grenville CR 2 (IC 687)- Long Beach, Long Beach. 1 Right Lane(s).
- Window
- 7:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 26 – May 1
Highway 400
Between DUNLOP STREET / SIMCOE ROAD 90 and HWY 26/ BAYFIELD STREET
ConstructionNightly Construction on HWY 400 Northbound Collector between DUNLOP STREET / SIMCOE ROAD 90 and HWY 26/ BAYFIELD STREET, Barrie. 2 Alternating Lane(s).
- Window
- 6:00 PM – 6:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 26 – Apr 30
HWY 403 MISSISSAUGA (Westbound)
Between ERIN MILLS PKWY and WINSTON CHURCHILL BLVD
ConstructionNightly Construction on HWY 403 MISSISSAUGA Westbound between ERIN MILLS PKWY and WINSTON CHURCHILL BLVD, Mississauga. 2 Alternating Lane(s).
- Window
- 9:00 PM – 6:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 27 – May 2
QEW (Fort Erie Bound)
At BERTIE ST / THOMPSON RD
Full constructionDaily Construction on QEW Fort Erie Bound Off-ramp at BERTIE ST / THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Fort Erie Bound)
At BOWEN ROAD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at BOWEN ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:30 AM – 5:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Fort Erie Bound)
At THOMPSON RD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Fort Erie Bound)
At CONCESSION ROAD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
QEW (Fort Erie Bound)
At GILMORE ROAD
Full constructionDaily Construction on QEW Fort Erie Bound On-ramp at GILMORE ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:30 AM – 5:30 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 27 – May 1
HWY 410 (Southbound)
Between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7
ConstructionNightly Construction on HWY 410 Southbound between MAYFIELD ROAD and BOVAIRD DRIVE/N JCT HWY 7, Brampton. 1 Alternating Lane(s).
- Window
- 9:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 2
HWY 410 (Northbound)
Between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD
ConstructionNightly Construction on HWY 410 Northbound between BOVAIRD DRIVE/N JCT HWY 7 and MAYFIELD ROAD, Brampton. 1 Alternating Lane(s).
- Window
- 10:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 2
Highway 400
Between ESSA RD / SIMCOE RD 27 and DUNLOP STREET / SIMCOE ROAD 90
ConstructionNightly Construction on HWY 400 Northbound Collector between ESSA RD / SIMCOE RD 27 and DUNLOP STREET / SIMCOE ROAD 90, Barrie. 1 Alternating Lane(s).
- Window
- 7:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – Apr 30
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionDaily Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).
- Window
- Time TBA
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 14
Highway 400
Between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21
ConstructionDaily Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 1 Left Lane(s).
- Window
- 10:00 AM – 11:59 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 14
Highway 401
At Townline Road / Wellington Rd 33 (286KM)
ConstructionNightly Construction on HWY 401 Eastbound between Townline Road / Wellington Rd 33 (286KM), Cambridge and Highway 6 South / Brock Road / Wellington Rd 46 (299KM), Morriston. 1 Alternating Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 2
Highway 404
At STOUFFVILLE ROAD
ConstructionNightly Construction on HWY 404 Northbound between STOUFFVILLE ROAD, Stouffville-Richmondhill and DAVIS DRIVE, Newmarket. 1 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 2
Highway 404
At DAVIS DRIVE
ConstructionNightly Construction on HWY 404 Southbound between DAVIS DRIVE, Newmarket and STOUFFVILLE ROAD, Stouffville-Richmondhill. 1 Alternating Lane(s).
- Window
- 9:00 PM – 5:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 2
Highway 401
Between Highway 4 / Colonel Talbot Rd and Glanworth Drive
ConstructionContinuous Construction on HWY 401 Eastbound between Highway 4 / Colonel Talbot Rd and Glanworth Drive, London. 1 Alternating Lane(s).
- Window
- 7:00 AM – 11:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
Between Glanworth Drive and Highway 4 / Colonel Talbot Rd
ConstructionContinuous Construction on HWY 401 Westbound between Glanworth Drive and Highway 4 / Colonel Talbot Rd, London. 1 Alternating Lane(s).
- Window
- 7:00 AM – 11:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 27 – May 1
Highway 401
At HWY 16 (IC 721B)
ConstructionDaily Maintenance on HWY 401 Westbound between HWY 16 (IC 721B), Johnstown and THOUSAND ISLAND PKWY (IC 685), Brockville. 1 Left Lane(s).
- Window
- 7:00 AM – 7:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 27 – May 1
Highway 401
At NAPANEE SERVICE CENTER E5 W/B
ConstructionDaily Maintenance on HWY 401 Eastbound between NAPANEE SERVICE CENTER E5 W/B , Odessa and Leeds & Grenville CR 2 (IC 687)- Long Beach, Long Beach. 1 Right Lane(s).
- Window
- 4:00 AM – 2:00 PM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 27 – May 1
Highway 401
At Leeds & Grenville CR 2 (IC 687)- Long Beach
ConstructionDaily Maintenance on HWY 401 Westbound between Leeds & Grenville CR 2 (IC 687)- Long Beach, Long Beach and NAPANEE SERVICE CENTER E5 W/B , Odessa. 1 Right Lane(s).
- Window
- 4:00 AM – 2:00 PM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 27 – May 1
Highway 401
At BOUNDARY RD (IC 796)
ConstructionDaily Engineering Investigation on HWY 401 Eastbound between BOUNDARY RD (IC 796), Cornwall and SUMMERSTOWN RD (IC 804)/SD&G CR 27, Summerstown. 1 Left Lane(s).
- Window
- 8:00 AM – 6:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – May 4
Highway 401
At SUMMERSTOWN RD (IC 804)/SD&G CR 27
ConstructionDaily Engineering Investigation on HWY 401 Westbound between SUMMERSTOWN RD (IC 804)/SD&G CR 27, Summerstown and BOUNDARY RD (IC 796), Cornwall. 1 Left Lane(s).
- Window
- 8:00 AM – 6:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – May 4
QEW (Fort Erie Bound)
At BERTIE ST / THOMPSON RD
Full constructionContinuous Construction on QEW Fort Erie Bound Off-ramp at BERTIE ST / THOMPSON RD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 28 – Apr 30
HWY 403 MISSISSAUGA (Eastbound)
Between BURNHAMTHORPE ROAD and WINSTON CHURCHILL BLVD
ConstructionNightly Maintenance on HWY 403 MISSISSAUGA Eastbound between BURNHAMTHORPE ROAD and WINSTON CHURCHILL BLVD, Mississauga. 1 Right Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 28 – May 2
QEW (Fort Erie Bound)
Between DORVAL DRIVE and DORVAL DRIVE
ConstructionNightly Maintenance on QEW Fort Erie Bound between DORVAL DRIVE and DORVAL DRIVE, Oakville. 1 Right(with HOV) Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Right(with HOV) Lane(s)
- Through
- Apr 28 – May 2
QEW (Fort Erie Bound)
Between MISSISSAUGA ROAD and ERIN MILLS PKWY/SOUTHDOWN ROAD
ConstructionNightly Maintenance on QEW Fort Erie Bound between MISSISSAUGA ROAD and ERIN MILLS PKWY/SOUTHDOWN ROAD, Mississauga. 1 Left Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – May 2
Highway 401
Between HWY 10 / HURONTARIO STREET and HWY 10 / HURONTARIO STREET
ConstructionNightly Construction on HWY 401 Westbound Collector between HWY 10 / HURONTARIO STREET and HWY 10 / HURONTARIO STREET, Mississauga. 2 Alternating Lane(s).
- Window
- 10:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 28 – May 1
Highway 400
Between SUNNIDALE ROAD and ST VINCENT STREET
ConstructionNightly Engineering Investigation on HWY 400 Northbound between SUNNIDALE ROAD and ST VINCENT STREET, Barrie. 2 Right Lane(s).
- Window
- 11:00 PM – 5:00 AM
- Lanes
- 2 Right Lane(s)
- Through
- Apr 28 – May 13
Highway 401
At THOUSAND ISLAND PKWY (IC 685)
ConstructionDaily Maintenance on HWY 401 Eastbound between THOUSAND ISLAND PKWY (IC 685), Brockville and MAITLAND RD (IC 705)/Leeds & Grenville CR 15, Maitland. 1 Left Lane(s).
- Window
- 7:00 AM – 7:00 PM
- Lanes
- 1 Left Lane(s)
- Through
- Apr 28 – Apr 30
Highway 401
At HARMONY ROAD
ConstructionDaily Maintenance on HWY 401 Eastbound between HARMONY ROAD, Oshawa and HWY 35/115, Clarington. 1 Alternating Lane(s).
- Window
- 7:00 AM – 11:00 AM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 29 – Apr 30
QEW (Fort Erie Bound)
Between GUELPH LINE and BRANT STREET
ConstructionNightly Construction on QEW Fort Erie Bound between GUELPH LINE and BRANT STREET, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Fort Erie Bound)
Between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD
ConstructionNightly Construction on QEW Fort Erie Bound between FAIRVIEW STREET/PLAINS ROAD and NORTHSHORE BLVD, Burlington. 1 Right Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
QEW (Fort Erie Bound)
Between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD
ConstructionNightly Construction on QEW Fort Erie Bound between BRANT STREET and FAIRVIEW STREET/PLAINS ROAD, Burlington. 1 Right Lane(s).
- Window
- 11:00 PM – 6:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 29 – May 14
Highway 401
At Wellington Road 35
ConstructionContinuous Construction on HWY 401 Westbound between Wellington Road 35, Guelph and Cambridge North & South OnRoute/Westbound & Eastbound service centre, Cambridge. 1 Right Lane(s).
- Window
- 8:00 PM – 7:00 AM
- Lanes
- 1 Right Lane(s)
- Through
- Apr 30 – May 1
QEW (Fort Erie Bound)
At CONCESSION ROAD
Full constructionContinuous Construction on QEW Fort Erie Bound On-ramp at CONCESSION ROAD, Fort Erie. ALL LANES CLOSED.
- Window
- 6:00 AM – 6:00 PM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 1
Highway 400
At HWY 26/ BAYFIELD STREET
Full constructionContinuous Maintenance on HWY 400 Southbound On-ramp at HWY 26/ BAYFIELD STREET, Barrie. ALL LANES CLOSED.
- Window
- 10:00 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 1
Highway 401
At LIVERPOOL ROAD
ConstructionDaily Maintenance on HWY 401 Westbound Collector Off-ramp at LIVERPOOL ROAD, Pickering. 1 Alternating Lane(s).
- Window
- 12:30 PM – 1:30 PM
- Lanes
- 1 Alternating Lane(s)
- Through
- Apr 30 – May 6
QEW (Fort Erie Bound)
At HWY 10/HURONTARIO
Full constructionContinuous Construction on QEW Fort Erie Bound Off-ramp at HWY 10/HURONTARIO, Mississauga. ALL LANES CLOSED.
- Window
- 11:59 PM – 5:00 AM
- Lanes
- ALL LANES CLOSED
- Through
- Apr 30 – May 1
Highway 400
At 5TH LINE
ConstructionNightly Construction on HWY 400 Southbound between 5TH LINE, Bradford and HWY 9, Kettleby. 2 Alternating Lane(s).
- Window
- 7:00 PM – 5:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 30 – May 15
Highway 400
At HWY 9
ConstructionNightly Construction on HWY 400 Northbound between HWY 9, Kettleby and 5TH LINE, Bradford. 2 Alternating Lane(s).
- Window
- 8:00 PM – 10:00 AM
- Lanes
- 2 Alternating Lane(s)
- Through
- Apr 30 – May 15
Highway 400
Between BASS PRO MILLS DRIVE and RUTHERFORD
ConstructionNightly Construction on HWY 400 Northbound Express between BASS PRO MILLS DRIVE and RUTHERFORD, Vaughan. 3 Alternating Lane(s).
- Window
- 10:00 PM – 6:00 AM
- Lanes
- 3 Alternating Lane(s)
- Through
- Apr 30 – May 1
Highway 401
Between Bloomfield Road and Bloomfield Road
ConstructionContinuous Construction on HWY 401 Westbound between Bloomfield Road and Bloomfield Road, Chatham. 1 Left Lane(s).
- Window
- 9:00 AM – 5:00 PM
- Lanes
- 1 Left Lane(s)